Shiva Group Canada has completed independent TAB and functional performance testing for a major Alberta healthcare expansion — documenting air and hydronic balance results, O&M handover packages, and owner-ready commissioning reports.

Scope of work
The engagement included pre-functional checklists, integrated system testing, and final verification aligned with ASHRAE Guideline 0 expectations for complex institutional facilities.
Independent third-party verification gives owners defensible data at turnover — not just contractor sign-off.
What owners receive
- Calibrated TAB reports with as-tested setpoints
- Functional performance test scripts and results
- O&M documentation aligned to submittal packages